5Einstein,H.H..Risk and risk analysis in rock engineering[J].Tunnelling and Underground Space Technology,1996,11(2):141~155
6Sturk,R.,Olsson,L.and Johansson,J..Risk and decision analysis for large underground projects,as applied to the Stockholm ring road tuning[J].Tunnelling and Underground Space Technology,1996,11(2):157~164
7Vik,E.A.,Sverdrup,L.,Kelley,A.etc.Experiences from environmental risk management of chemical grouting agents used during construction of the Romeriksporten tunnel[J].Tunnelling and Underground Space Technology,2000,15(4):369~378
8Tonon,F.,Mammino,A.,Bernardini,A..Multiobjective optimization under uncertainty in tunneling:application to the design of tunnel support/reinforcement with case histories[J].Tunnelling and Underground Space Technology,2002,17:33~54
9Yoo,C.,Kim,J.H..A web-based tunneling-induced building/utility damages assessment system:TURISK[J].Tunnelling and Underground Space Technology,2003,18:497~511
10Eskesen,S.D.,Tengborg,P.,Kampann,J.,etc.Guidelines for tunnelling risk management:International Tunnelling Association,Working Group No.2[J].Tunnelling and Underground Space Technology,2004,19:217~237