城市基础设施项目进度的控制 被引量:1

Progress control of urban infrastructure project
原文传递
导出
摘要 应用系统动力学理论确定城市基础设施项目进度系统的边界,在项目生命周期内从进度形成机制的角度对进度风险事件进行了识别,并结合问卷调查建立了项目进度仿真模型,分析了城市基础设施项目进度的变化趋势及风险事件影响下的进度偏差行为模式。结果显示:城市基础设施项目实施时间及成本是计划的1. 278倍和1. 284倍,影响项目实施时间及成本的关键风险分别为中期变更风险、建设成本超支风险、群体事件风险。在此基础上,结合阶段风险事件影响下的进度偏差行为模式提出了应对策略。 System dynamics is used to determine the boundary of the urban infrastructure project progress system,and progress risk events are identified from the perspective of the progress formation mechanism within the project life cycle.And a system dynamics model based on a questionnaire survey is established to analyze the developing tendency of urban infrastructure project progress and progress deviation behavior mode affected by risk events.The results show:The actual time and cost of urban infrastructure projects are 1.278 times and 1.284 times as compared to those of the original plans;The key risks affecting the time and cost are medium-term change risk and construction cost over-spending risk respectively,and the sensitive risks affecting both time and cost are financial risk and colony affairs risk.Further,according to the behavioral pattern of progress deviation influenced by phased risk events,responding proposals are made for relevant strategies to promote a higher progress control level for urban infrastructural projects.
作者 程鸿群 后倩 CHENG Hong-qun;HOU Qian
出处 《城市问题》 CSSCI 北大核心 2019年第4期72-80,共9页 Urban Problems
关键词 城市基础设施项目 进度控制 系统动力学 时间偏差 成本偏差 urban infrastructure project progress control system dynamics time deviation cost deviation
  • 相关文献

参考文献12

二级参考文献189

共引文献322

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部