摘要
从黄土地区的特殊地质出发,以109国道清水河至十七沟段为试验研究对象,概要地论述黄土地区路基压实施工存在的问题,提出了今后施工具体操作方法及注意事项。
Proceeding from the special geology of loess area and making 109 state-onned road (from Qing ShuiHe to ShiQiGou) on object of test and study,the orticle briefly disscusses some problems in the construction of rolling roadbed in loeee areu and points out some concrete methods and some matters needing attention in the future construction. \ \
关键词
黄土地区
路基压实
Loess area\ Rolling roadbde