7ZHANG L M, NG C W W, CHAN F, PANG W. Termination criteria for jacked pile construction and load transfer in weathered soils[J]. Jourrlal of Geotechnical and Geoenvironmental Engineering, 2006, 132(7): 819 - 829.
8YU F, YANG Y E Discussion of "termination criteria forJacked pile construction and load transferin weathered soils" by L M Zhang, C W W Ng, F Chan and H W Pang[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2007, 133(11): 1477- 1479.
9GAVIN K G, O'KELLY B C. Effect of friction fatigue on pile capacity in dense sand[J]. Journal of Geotechnical and Geoenvironmental Engineering, 2007, 133(1): 63 - 71.
10AIREY D W, Al-DOURI R, POULOS H G,Estimation of pile friction degradation from box test[J]. Geotechnical Testing Journal, 1992, 15(4): 388 - 392.