1Technical and System Requirements for Advanced Distribution Auto- mation, EPRI, Palo Alto, CA :2004. 1010915.
2Guidelines for Planning Interoperable Distribution Automation Sys- tems, EPRI, Palo Alto, CA : 2004.1002161.
3Distribution Fast Simulation and Modeling:Situation Awareness Re- quirements Based on a Distribution State Estimator. EPRI, Palo Alto, CA and ~lectricit6de France :2007. 1013840.
4Intelligrid SM - Distribution Fast Simulation & Modeling Engineering Requirements : Documents Guideline. EPRI, Palo Alto, CA :2005. 1012927.