摘要
针对国内目前桥梁施工控制管理水平,以嘉陵江马鞍石大桥为依托,介绍了一个基于C/S模式的梁桥施工控制管理信息系统(CCB-MIS)的设计与实现过程,并阐述了系统结构、功能模块划分及其主要特点。
Aiming at the domestic construction control and management system and taking the Maanshi bridge as a support, this paper introduces the design and working process of management information system (MIS) for beam bridge construction control based on Client/Serer structure,and explains the system structure and the divi-sion of function modules.
出处
《公路交通技术》
2002年第3期35-36,88,共3页
Technology of Highway and Transport