对3车道大断面公路隧道问题的思考 被引量:15

Considerations on Highway Tunnels with Large Sections of Three Lanes
下载PDF
导出
摘要 从设计、施工与围岩稳定性、动态施工过程、仿真物理模拟和数值模拟技术等方面详细地阐述了国内外3车道大断面公路隧道的现状,并就大家关心的问题作了分析。 This paper describes the details of the current situation of highway tunnels with large sections of three lanes at home and abroad based on design, construction, stability of surrounding rocks, dynamic construction pro-cess,emulational physical simulation and digital simulation, etc. and analyzes the matters of interest to every-body.
出处 《公路交通技术》 2002年第3期74-77,共4页 Technology of Highway and Transport
关键词 3车道大断面公路隧道 设计 施工 围岩稳定性 仿真模拟 数值模拟 highway tunnels with three lane large section design and construction stability of surrounding rocks emulational simulation
  • 相关文献

参考文献9

二级参考文献31

  • 1周应麟,邱喜华.长管棚配合明洞进洞技术[J].中南公路工程,2005,30(2):118-119. 被引量:3
  • 2王毅才.隧道工程[M].北京:人民交通出版社,2002..
  • 3[1]关宝树.隧道工程施工[M].北京:人民交通出版社,2002.
  • 4[5]石绍甫.拱桥(上册)[M],人民交通出版社,1997.
  • 5王明年,岩土工程学报,1996年,18卷,1期,48页
  • 6王明年,工程力学,1995年,增刊,1494页
  • 7团体著者,高地应力地区隧道支护衬砌结构形式及受力特点的研究,1994年
  • 8JTJ042—94.公路隧道施工技术规范[S].[S].,..
  • 9JTGD70—2004.公路隧道设计规范[S].[S].,..
  • 10.公路隧道设计规范(JTG 1370—2004)[s].北京:人民交通出版社,2004..