摘要
In the construction of Three Gorges Project, the total amount of concrete is about 28 Mm\+3 , and the total amount of metal works and reinforcement is approximately 0.72 Mt . The TGP is constructed in 3 stages . The preparation period together with the first stage is 5 years , the second stage and third stage are both 6 years .In the second stage construction of 6 years (1998~2003) , there are 18.46 Mm\+3 of concrete to be placed and 0.192 Mt of metal works and embedded parts for mechanical and electric equipment to be installed . In 1999, a world record of annual concrete placement of 4.585 Mm\+3 was set . In 2000, it is planned to place 5.4 Mm\+3 of concrete and to install 38 000 t of metal works . Construction equipments and layout of construction site , concrete production and its temperature control, metal works, mechanical and electric equipments in the second stage construction are presented.
In the construction of Three Gorges Project, the total amount of concrete is about 28 Mm\+3 , and the total amount of metal works and reinforcement is approximately 0.72 Mt . The TGP is constructed in 3 stages . The preparation period together with the first stage is 5 years , the second stage and third stage are both 6 years .In the second stage construction of 6 years (1998~2003) , there are 18.46 Mm\+3 of concrete to be placed and 0.192 Mt of metal works and embedded parts for mechanical and electric equipment to be installed . In 1999, a world record of annual concrete placement of 4.585 Mm\+3 was set . In 2000, it is planned to place 5.4 Mm\+3 of concrete and to install 38 000 t of metal works . Construction equipments and layout of construction site , concrete production and its temperature control, metal works, mechanical and electric equipments in the second stage construction are presented.
出处
《人民长江》
北大核心
2001年第S1期2-4,共3页
Yangtze River