Excavation of Inlet Tunnels at Geheyan Power Station

Excavation of Inlet Tunnels at Geheyan Power Station
下载PDF
导出
摘要 The Geheyan Power Station on the Qingjiang river has four inlet tunnels, on the right bank, with its excavation diameter of 11.3 m to 12.5 m, after lining diameter of 9.5 m, axis to axis spacing of 24 m. The thickness of the pillar between tunnels should usually be more than two times of tunnel diameter to ensure the stability of surrounding rock during excavation. In this paper, the excavation methods of tunnels with the pillar thickness as small as the tunnel diameter, such as smooth surface blasting, shotcrete support protection, are emphatically discussed. The Geheyan Power Station on the Qingjiang river has four inlet tunnels, on the right bank, with its excavation diameter of 11.3 m to 12.5 m, after lining diameter of 9.5 m, axis to axis spacing of 24 m. The thickness of the pillar between tunnels should usually be more than two times of tunnel diameter to ensure the stability of surrounding rock during excavation. In this paper, the excavation methods of tunnels with the pillar thickness as small as the tunnel diameter, such as smooth surface blasting, shotcrete support protection, are emphatically discussed.
出处 《人民长江》 北大核心 2001年第S1期21-22,共2页 Yangtze River
关键词 POWER TUNNEL adjacent TUNNEL EXCAVATION New Austrian TUNNELLING method GEHEYAN POWER Station power tunnel adjacent tunnel excavation New Austrian tunnelling method Geheyan Power Station

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部