摘要
本文对高强轻质混凝土的施工工艺进行了详细的说明,并结合桥梁加固旧桥面改造的工程实例,通过对高强轻质混凝土自身特性的研究与应用,证实了其在工程实际中的可行性,解决了桥梁跨中位置线形与自重的矛盾。
The article illustrates in detail the construction technique of the piece with high-strength lightweight concrete and combines with the project example of bridge deck transformation in old bridge reinforcement,according to the study and application on own characteristics of high-strength lightweight concrete,It proved that the feasibility of the improvement in the old bridge reinforcement and solved the contradictions between wire-type and dead weight of the bridge.
出处
《商品混凝土》
2009年第8期53-54,57,共3页
Ready-Mixed Concrete
关键词
旧桥面改造
高强轻质混凝土
施工工艺
Old bridge deck transformation
High-strength lightweight concrete
Construction technique.