C70高强钢管混凝土的泵送顶升施工研究 被引量:1

The lifting and conveying construction research of C70 high strength concrete filled steel tube
原文传递
导出
摘要 本文立足于滨海开发区于家堡北京建工的钢管混凝土施工,结合天津塘沽的原材料,通过配合比优化,探讨了C70高强混凝土的配合比和顶升施工工艺,研究结果表明,通过原材料和外加剂的选择、配合比的优化制备出了满足输送和顶升施工方案的C70高强钢管混凝土,为天津地区的C70高强混凝土顶升施工奠定了扎实基础。 This article discussed about the C70 high strength concrete mix ratio and lifting and conveying construction technology based on the concrete filled steel tube construction technology by Beijing Construction Group located in YujiaBu,combined with the raw materials in Tanggu area,Tianjin,and through the optimal mix design.The research result showed that the C70 high strength concrete could be produced to meet the lifting and conveying construction approach through the selection of the raw materials and addmixtures as well as the optimal mix design.This establishes the solid foundation for C70 high strength concrete lifting and conveying constructuion technology for Tianjin areas.
出处 《商品混凝土》 2012年第5期60-63,共4页 Ready-Mixed Concrete
关键词 C70高强自密实混凝土 钢管柱 止流阀 顶升 施工工艺 C70 high-strength self-compacting concrete steel pipe cut-off valve lifting and conveying construction techniques
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部