摘要
邯峰发电厂一期工程设计为 2× 660MW汽轮发电机组 ,汽机岛设备由德国SIEMENS公司设计制造 ,设计理念及安装工艺与国产同类型机组存在较大的不同 ,文中将笔者在汽轮机设备安装过程中的一些体会对照国产 60 0MW机组 ,加以简单分析。
In Hanfeng Power Plant, there installed 2×660 MW steam turbine-generator units.SIEMENS,Germany,designed and manufactured the equipment on 'turbine island'.The design philosophy and installation procedure are something different from domestic made units of similar capacity. Comparing to domestic made 600 MW unit, the author briefly presents his installation experience in this paper.
出处
《河北电力技术》
2002年第4期17-20,共4页
Hebei Electric Power