摘要
对沉降后浇带位置的选择、浇筑时间的确定、沉降和差异沉降的计算方法和取消后浇带的相关依据等问题进行了研究。结合工程实践,分析了不同位置沉降和差异沉降的变化特征,对后浇带的提前浇注和取消后浇带的情况提出了建议。
The issues of late-pouring belt are discussed,including position of late-pouring belt,deformation of pouring time,calculation of settlement and basis of canceling the late-pouring belt.Combined with the actual project,the variation characteristics of differential settlement are analyzed,and the condition of pre-pouring and cancelling of late-pouring belt are proposed.
出处
《施工技术》
CAS
北大核心
2012年第S1期131-133,共3页
Construction Technology
关键词
后浇带
计算方法
差异沉降
浇筑
late-pouring belt
calculation method
differential settlement
pouring