南京汉佰纺织品工业厂房项目地基以回填土为主,经过论证和试验,采用强夯法进行加固。该方法施工简便,处理费用低,处理后的地基承载满足设计要求,效果良好,为类似工程的地基处理提供参考。
The backfill soil is mainly in the foundation of Nanjing Han Bai textiles industry workshop project. Through demonstration and test,the reinforcement is carried out by using dynamic compaction method. The method is simple in construction,low in cost,and good in effect,which can satisfy the design requirements,and provides reference for the foundation treatment of similar projects.
出处
《施工技术》
CAS
北大核心
2016年第S1期92-95,共4页
Construction Technology
关键词
强夯
夯锤
回填土
地基
承载力
dynamic compaction
hammer
backfill soil
foundation