摘要
以深圳南山区中电长城大厦项目为背景,介绍了栈桥板与洗车系统一体化在深基坑工程中的运用,该方案既能保证开挖过程支撑体系完整、安全的前提,也满足文明施工要求。
Based on Shenzhen Nanshan Power & Saatchi Building project pit,the trestle board and washing integrated land type scheme was introduced,which not only can ensure complete safety of the premise,but also meet the construction requirements of civilization.
出处
《施工技术》
CAS
北大核心
2016年第S1期127-130,共4页
Construction Technology
关键词
深基坑
栈桥板
洗车系统
出土
一体化
deep foundation excavation
trestle board
washing system
unearthed
Integration