以华润大厦为背景,阐述"BIM+凸点顶模"的创新应用方式.将BIM技术深入到凸点顶模的深化设计与施工模拟的创新应用中,提高了顶模质量、确保顶模的安装爬升安全、节约工期,达到节省成本的目的。
Taking Huarun Building as the background,the'top BIM + convex point mould'innovative application methods was elaborated. BIM was applied in the innovative application of detailed design and construction simulation of the convex point. As a result,the top mold quality was raised and the top mould installation safety climbing was ensured,which saves time to cost savings.
出处
《施工技术》
CAS
北大核心
2016年第S1期772-775,共4页
Construction Technology
关键词
BIM
凸点顶模
深化设计
结构验算
施工模拟
一体化
BIM
convex point top die
deepen design
structure checking
construction simulation
integration