期刊文献+

三峡左岸电站大型永久机电设备运输方案简介 被引量:1

Transport Scheme of Major Permanent Equipment for Left Hydro Plant
下载PDF
导出
摘要 根据三峡左岸电站大型永久机电设备的特点、重要装卸转运站点的情况和起吊条件以及三峡工程对外交通概况 ,对各种运输方案进行了分析 ,认为水运是机组转轮、主变压器和厂房桥机大梁等主要大件的可能运输方案。在左岸电站大型永久机电设备的运输组织工作中 ,业主通过招标优选承运单位 ,开发设备运输信息系统 ,开展大件、重件和特殊件运输方案研究 ,以确保三峡设备安全及时地抵达三峡工地。 Considering the features of major permanent M & E equipment for the left powerhouse at the Three Gorges Project, the conditions of major transfer points and lifting, as well as the communications access to the dam site, it has been considered that the waterway could be the best transport line for the major equipment, such as runners, main transformers, girders of bridge cranes, and so on, based on the analyses of various transport schemes. In transport organization work, the Owner has selected by the competitive bidding the transport contractors, developed the equipment transport information system and carried out the study on transport of major and special equipment and components, in order to ensure the equipment can be transported safely to the site.
出处 《中国三峡建设》 2000年第5期6-7,16-50,共4页 China Three Gorges Construction
关键词 机电设备 运输 转轮 主变压器 M & E equipment Transportation Runner Main transformer
  • 相关文献

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部