三峡永久船闸深槽开挖施工技术 被引量:1

Excavation Technique for Deep Trench of Permanent Shiplock
下载PDF
导出
摘要 在复杂条件下 ,为满足三峡永久船闸闸室槽挖及边坡稳定的要求 ,以达到优质、高效、安全施工的目的 ,采用了一系列诸如爆破方式、设计参数、微差爆破及成型爆破等综合控制技术。通过深槽开挖施工实践 ,总结了对高边坡、高应力释放区的成型爆破措施以及槽、井、洞开挖爆破相互影响的关系。 Under the complicated conditions and in order to meet the stability requirement for trenching and sloping of the permanent shiplock and the objectives in high quality, high efficiency and safe construction, a series of such control techniques as regarding blast methods, design parameters, microsecond delay blast and shaping blast were performed. Based on the construction practice in deep trench excavation, the shaping blast measures for high slope and high stress release area and the interference due to blasting between trenches and wells and tunnels as well as between blasts and supporting have been summarized in this paper.
作者 张文辉
出处 《中国三峡建设》 2000年第5期10-12,50,共4页 China Three Gorges Construction
关键词 三峡永久船闸 深槽开挖 施工技术 Permanent shiplock Deep trench excavation Construction technology
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部