期刊文献+

武汉天兴洲长江大桥公路引线桩基工程施工组织设计 被引量:1

Construction Designs of Pile Foundation of Lead Road of Wuhan Tianxingzhou Changjing Bridge
原文传递
导出
摘要 武汉天兴洲长江大桥是武汉的第六座长江大桥,第二座公铁两用桥,武汉三环线重点工程。于2003年12月奠基,2004年9月28日开工,并于2008年9月10日合拢,于2009年12月26日建成通车。武汉天兴洲长江大桥是世界最大公铁两用桥,下层为可并列行使四列火车的铁道,总投资约110.6亿元人民币。作为该桥的公路引线部分,地处长江一级阶地,为软土地基,根据勘察资料,采用桩基础设计。 The sixth changjiang bridge in wuhan,Tianxingzhou Changjiang Bridghe,the second road -railway dual - purpose bridge is one of the key projects along the tnird circulation line in Wuhan.In December 2003,ground breaking for the bridge commenced;on September 28,2004 construction of the bridge began;on September 10, 2008 the bridge structure closed up,and on December 26,2009 the whole bridge was completed for traffic.It is one of the biggest road - railway dual - purpose bridges in the world,on whose sublayer are rails for four trains moving alongside.The total cost for construction is 11.06 billion yuan.The lead road of the bridge is on the first grade terrace of Changjiang drainage areas,belonging to weak foundation.Therefore die design of pile foundation was chosen for construction.
作者 邵元纯
出处 《湖北水利水电职业技术学院学报》 2011年第4期11-14,7,共5页 Journal of Hubei Water Resources Technical College
关键词 天兴洲长江大桥 施工组织设计 安全文明施工 桩基础 Tianxingzhou changjiang bridge construction organization design safety construction pile foundation
  • 相关文献

参考文献1

  • 1[4]JTJ 041-2000 公路桥涵施工技术规范[S].北京:人民交通出版社,2000.

共引文献93

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部