摘要
燃气施工阶段的造价控制是个动态控制的过程,它是紧紧围绕着控制三大目标:投资、质量和进度而进行的,它主要任务是采用组织、技术、经济、合同与等多方面的措施,以主动控制的方式,把工程造价控制在合理的范围和核定的造价限额内.
The cost control in gas construction phase is a dynamic process,which is tightly centered with three main goals:investment,quality and progress.The main task of cost control is the use of organization,technique,economic,contracts and many other methods to control the project cost in a reasonable range.