理想的综采工作面是上下风巷平行 ,切眼约垂直上下风巷。潘一矿 2 331(1)综采工作面因地质条件限制 ,分两段安装后 。
The ideal fully-mechanized coal winning working face is that the up wind roadway is parallel the down one, the cutting hole is perpendicular to the up and do wind roadway.Because the geologic condition,Panyi Coal Mine 2331(1) working face is abutting joint installation in working process by separating to two parts.
出处
《煤矿机械》
北大核心
2002年第9期76-77,共2页
Coal Mine Machinery
关键词
综采工作面
对接
安装
回采
地质条件
fully-mechanized coal winning
abutting joint
method