摘要
桐子壕航电工程自 2 0 0 0年 9月开工以来 ,已历经一期一枯、一汛、一期二枯 ,到目前为止 ,完成混凝土浇筑量 42万 m3,土石方开挖 10 6万 m3,顺利完成二枯目标 ,安全进入了汛期施工。阐述了在施工中运用的新工艺及合理引进、采用的新材料新产品。
It took Chengdong hydropower station 43 months to be completed.In difficult concrete placing for powerhouse,construction design optimization was continuously carried out and new technology,new technique were developed,popularized and applied so as to speed up construction rate and successfully complete the project according to construction schedule.