摘要
三峡工程一系列技术难题中,解决三峡工程这样世界级的高坝通航问题是其中的关键技术之一。三峡工程双线五级船闸从通航建筑物的总体布置,泥沙淤积碍航问题,船闸输水系统水力学问题,高陡边坡处理问题,主要金属结构及机电设备制造和技术等方面都有特殊要求,通过充分的科学试验、论证和工程实践,这些问题在实践中得到了逐步解决。
Among a series of technical difficulties in building the Three Gorges project. how to solve the navigation problem at a high dam just like the Three Gorges project as world level is one of key technologies. The Three Gorges double-way and five-step shiplock has many special technical requirements such as its overall layout, influence of sediment deposition on navigation, hydraulics of water conveying systems, stability of high and steep slope, and manufacture and technology of major metal structures and electromechanical equipment. Through extensive scientific experiments, examinations and engineering practice, the above-mentioned issues have been resolved well.
出处
《中国三峡建设》
2002年第8期7-9,共3页
China Three Gorges Construction