期刊文献+

东深供水工程生化预处理挂膜过程分析 被引量:4

Process analysis of bio-film hanging to carrier during the biochemical pretreatment of Dongjiang-Shenzhen Water Project
下载PDF
导出
摘要 介绍东深供水工程生化预处理挂膜启动过程中 ,氨氮、CODMn去除效果和填料上生物膜变化的特点。根据氨氮去除率 (≥ 50 .0 % )、生物膜形状、生物膜上动物种类和数量可判断挂膜启动过程是否完成。本试验挂膜启动 2 5天 ,比小型试验增加了 1 0天左右 。 It has been discussed in this paper that removal rates of ammonian and COD Mn are influenced by the characters of bio film hanged to carrier, during the biochemical pretreatment of supply water project of Dongjiang Shenzhen. Bio film culture process is estimated by the shape of bio film, sorts and number of the animalcules and the removal rates ( ≥50.0 %)of ammonian. The time for succeed industrial test is 25 day and the lab succeed test is only 14 day because the temperature was lower during industrial test.
出处 《环境技术》 2002年第4期41-44,共4页 Environmental Technology
关键词 东深供水工程 生化预处理 挂膜过程分析 生物膜 氨氮去除 supply water project biochemical pretreatment bio film removal rates of ammonian
  • 相关文献

参考文献3

共引文献64

同被引文献50

引证文献4

二级引证文献68

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部