摘要
System analysis is made in this paper of the coal-fired MHD/steam combined cycle pilot power plant in the size range tens of MWe. System performance are presented of such plants with three sizes: one 12 MWe unit, two 12 MWe units and one 50 MWe unit which are considered as retrofits to the existing Beijing No.3 Heat and Power Plant. Parametric studies are performed for the 2×12 MWe units and the optimum system pararneters are obtained.