对 2 0年来 5 0 0 k V输变电一次主要设备的运行情况进行了分析和总结 。
The paper has given out an analysis and summary about the operation condition of 500kV transmission and transformation main primary equipment for the last two decades. Its result has a very important and practical meaning for the production guidance.
出处
《湖北电力》
2002年第4期18-22,42,共6页
Hubei Electric Power