摘要
介绍了 AGC控制的基本原理、湖北电网实现 AGC控制的过程和发电机组接受 AGC控制的性能指标的确定 ,结合火电机组的特点阐述了保证系统有效地实现
The paper introduced the realization of Hubei Power system AGC control and the confirmation of performance index for the generator sets to accept the AGC control. Based upon the characteristics of thermo power generator set, it expounded several problems which should be cared about to ensure the systems effectively realizing the AGC control.
出处
《湖北电力》
2002年第4期73-76,共4页
Hubei Electric Power