摘要
介绍了东鞍山烧结厂 3 60m2 烧结机骨架的安装和调试过程 ,包括 :基准点、水准点及中心线的设定 ;骨架底板的安装和检测等。
The installation of supporting frame of 360m 2 sintering machine in DONGANSHEN sintering plant included the settings of all base points and centrelines,the mounting and detecting of different position frames etc were described in this paper
出处
《烧结球团》
北大核心
2002年第5期23-26,共4页
Sintering and Pelletizing
关键词
调整
烧结机骨架
骨架底板
安装
基准点
中心线
sintering machine support, base plate of support,installation, baes ponit, centre line