摘要
针对南钢 1号球团竖炉自 1997年 6月到 1998年 3月间发生的 8次结块结炉事故 ,分析了结块机理和该厂发生结炉的原因 ,并提出了有效的预防措施 。
Based on eight times fused lump accident occurred in № 1 shaft furnace of NANGANG pelletizing plant in between June 1997 to march 1998,the mechanism and reason of fused lump in shaft furnace were analyed Some effective measures were proposed and adopted, these were avaiable for other pelletizing shaft furnace reference
出处
《烧结球团》
北大核心
2002年第5期36-37,29,共3页
Sintering and Pelletizing
关键词
球团竖炉
结炉
预防
pelletizing shaft furnace, fused lump, prevention