工程建设的新特点与中国三峡总公司的可持续发展 被引量:1

Future Key Points at TGP and Sustainable Development of CTGPC
下载PDF
导出
摘要 本文介绍了三峡工程进入2002年后工程建设的新特点,并对工程下一步两个重点项目三期截流和碾压混凝土围堰的技术难点和工期安排做了深入分析。另外,作者根据国家电力体制改革的重要内容,以及中国三峡总公司自身情况,对公司未来的可持续发展之路亦做了深入探讨。借助中国三峡总公司的品牌优势和资本实力,吸收其它形式的能源,优化能源结构;进一步降低工程造价,提高三峡电价在电力市场的竞争力;依靠科学管理,实现电力生产利润最大化,深化内部改革等措施,促进中国三峡总公司可持续发展。 In this paper the author presents the new features in construction of the Three Gorges project (TGP) after the year 2002, and analysis has been made thoroughly of the technical difficulties and time schedule for the key items, i. e. , the river closure on the open diversion channel and the RCC cofferdam at the third-phase of the Three Gorges project. Additionally, an approach has been made to the sustainable development of the China Three Gorges Project Corporation (CTG-PC) , in the light of the important policy concerning regulation and reform of the current power system in China as well as current self-situation and conditions of the CTGPC. Unitizing self-well-known brand edge and capital strength to absorb other forms of energy to optimize its energy structure, further reduce the project cost and enhance the competitiveness in the power market by the price of electricity from the Three Gorges plant, and strengthen the scientific management to a-chieve maximum benefits of the electric production, promote the sustainable development of the CTGPC through a series of measures such as internal reform and regulation, etc.
作者 曹广晶
机构地区 中国三峡总公司
出处 《中国三峡建设》 2002年第9期10-12,共3页 China Three Gorges Construction
关键词 三峡工程 截流 电力体制 改革 可持续发展 Three Gorges project (TGP) river closure power system reform sustainable development.
  • 相关文献

同被引文献4

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部