摘要
利用小浪底水库有 72 .5亿 m3淤沙库容的有利时机 ,基本可以单独完成下游综合利用调节任务 ,从而使三门峡水库的综合利用任务改变为 :根据“确保西安”的原则 ,以库区排沙、防洪、防凌为主 ;发电的运用以不影响潼关水位为前提条件 ,力争潼关水位能尽快恢复到接近三门峡建库前水平。
Since the Xiaolangdi reservoir has a sediment capacity of 7.25 billion m 3 and can individually fulfill the regulation functions of d/s comprehensive utilization, the Sanmenxia reservoir's functions can be changed as follows. 1) Reservoir sediment ejection, flood control and ice-jam prevention are its main functions provided that Xi'an's safety is ensured; 2) Generation operation should be under the precondition of no effect on the water level at Tongguan and strive to resume the level to that before construction of the Sanmenxia reservoir.
出处
《西北水电》
2002年第3期4-7,共4页
Northwest Hydropower
关键词
三门峡水库
陕西库区
水位
综合利用
Sanmentxia
Xiaolangdi
operation level
comprehensive
utilization
water level at Tongguan