摘要
本文主要针对国内一大型水电站AGC成组运行有功策略分配原则、220kV系统与550kV系统联络变4号主变压器不能过载运行,将4号主变压器功率纳入3号机组可调范围计算策略以及对多台机组成组下其组合振动区模型建立的方法进行了阐释,并对AGC投入的安全策略进行了分析。这可以对其他电站AGC策略设计提供相关参考。
This paper mainly for the domestic large-scale AGC group running active strategy allocation principle,220kV system and 550kV system of hydropower station with #4 main transformer cannot overload operation,the main transformer #4 pow-er into #3 machine adjustable range as well as the calculation method of multi machine group composed of the combined meth-od to establish vibration model are explained the security strategy,and analyzes theAGC investment.This can provide reference to the design of other powerr plant AGC strategy.
出处
《水电自动化与大坝监测》
2014年第4期70-72,共3页
HYDROPOWER AUTOMATION AND DAM MONITORING
关键词
AGC
主变压器
组合振动区
安全策略
AGC
transformer
combined vibration area
security strategy