摘要
本文介绍了宜兴抽水蓄能电站一管双机甩负荷试验的测点布置与选择、试验程序及试验结果,并对试验结果与调保计算成果进行比对分析,对其他抽水蓄能电站双机甩负荷试验及调保计算复核具有一定借鉴意义。
The measuring point arrangement、procedure and results of double load rejection in one tunnel of Yixing Pumped Storage Power Plant are introduced.The test results are compared with regulation guarantee calculation.This study can provide references to the re-checking calculation of regulation guarantee and double load rejection in one tunnel of other pumped storage power plants.
出处
《水电自动化与大坝监测》
2015年第1期49-51,共3页
HYDROPOWER AUTOMATION AND DAM MONITORING
关键词
一管双机甩负荷
调保计算
试验流程
Double load rejection in one tunnel
Regulation guarantee calculation
Test procedure