摘要
抽水蓄能电站机组运行灵活,在电网中除了调峰填谷以外,还可承担调频、调相和紧急事故备用等作用,实时地密切关注抽水蓄能电站水库水情及可发电、抽水时长等信息至关重要,基于以上需要,特提出研制水电站水库水情计算程序。本文以国内某抽水蓄能电站水库水情估算方法的实例,简介水库库容水量比较和蓄能电站发电、抽水时长预估预判的程序研制及应用。
Pumped storage power station units are flexible when it’s running. It is not only regulate peaks and fil troughs in the grid,but also adjust the frequency of bear and adjust the phase and backup in case of emergency.Real-time and close attention to the reservoir water level of pumped storage power station and power generation,pumping duration and other information are very important.Based on the above needs,It is necessary to develop an application of Pumped Storage Power Station Reservoir computer program. This article set a domestic Pumped Storage Power Regimen estimation methods as an example to introduce the high water storage capacity of the reservoirs power generation,the development and application of time estimates predict when pumping.
出处
《水电自动化与大坝监测》
2015年第4期91-94,110,共5页
HYDROPOWER AUTOMATION AND DAM MONITORING
关键词
水电站水库
水情
预估
程序
reservoir
water level
estimates
program