摘要
以电法勘探理论为基础 ,介绍了运用大功率激电方法在吉林通化二密铜矿新一轮找矿中发现新矿体的工作过程 ,指出在新的成矿理论指导下 ,充分研究工作区地质、地球物理条件 ,恰当地选用物探方法 ,合理进行工作部署 。
Based on the theory of electrical exploration, this paper reports the procedure of applying the high power IP method to the new round of ore prospecting work in the Ermi copper ore district, which has led to the discovery of new orebodies. It is pointed out that, under the guidance of the new metallogenic theory, we can surely achieve satisfactory ore-prospecting result so long as we study thoroughly geological and geophysical conditions of the working area, choose proper geophysical techniques, and arrange the work in a rational way.
出处
《物探与化探》
CAS
CSCD
2002年第5期364-367,共4页
Geophysical and Geochemical Exploration