牛路岭电站20MW机组3号机改造技术分析

Technical Analysis of Niululing Hydropower Station 20MW Unit 3 Transformation
下载PDF
导出
摘要 针对牛路岭水电站存在的主轴密封不严、空蚀、振动等问题,对3号机组进行了技术改造。本次改造主要对转轮、顶盖、底环、固定止漏环、主轴密封、导叶、控制环、尾水管直锥段等部件及其附属相关部件进行了优化设计。通过3号水轮机改造,将机组性能进一步优化,改造效果总体情况良好,提高了效率、空蚀和水力稳定性明显改善,使牛路岭电站的水轮机达到现代先进水平。 In order to solve the disadvantages of Niululing hydropower station, such as the lax main shaft seal, the cavitations, the vibration and so on, the No.3 unit is technical-transformed by Harbin Institute of Large Electrical Machinery. The runner( A773 a type), the head cover, the bottom ring,the fixed stanch ring, main shaft seal, guide vane, controlling ring, the straight cone of draft tube and their attached parts is optimal designed in this transformation. By this transformation for the No.3 hydraulic turbine, the problems left by the former 3 units' transformation is further optimized,and therefore the hydraulic turbine of the Niululing hydropower station reach a modern advanced level.
出处 《大电机技术》 2015年第1期44-47,共4页 Large Electric Machine and Hydraulic Turbine
基金 试验装置设计及制造(820-GC-024)
关键词 牛路岭水电站 水轮机 结构改造 Niululing hydropower station hydraulic turbine the construction rehabilitation
  • 相关文献

参考文献7

二级参考文献18

  • 1钟苏.影响混流式水轮机顶盖刚度的主要因素分析[J].大电机技术,1995(3):36-40. 被引量:12
  • 2孙建平,熊浩,敖建平,郑莉媛.补气对三峡左岸机组低水头运行稳定性的影响[J].华中科技大学学报(自然科学版),2006,34(9):75-77. 被引量:7
  • 3曲道志.反击式水轮机导叶密封及漏水量计算[J].水力机械技术,1987,(1).
  • 4刘大恺.水轮机[M].北京:中国水利水电出版社,1997..
  • 5蒋静芳.HL710机组振动及补气改进.水电站机电技术,1983,(3):58-61.
  • 6张蒲转.采用顶盖补气法消除混流式水轮机振动的效果.西北水力发电,1987,(4).
  • 7Practical Solution for Draft Tube instability[J].Water Power and Dam Construction,1981,(2).
  • 8曲道志.国外解决尾水管中不稳定流的几种办法.水利水电技术,1986,(10):61-65.
  • 9龚守志 黄凌.碧口水电站一号机水力共振的分析与改善措施.水力机械技术,1986,(5).
  • 10哈尔滨大电机研究所编.水轮机设计手册[K].北京:机械工业出版社,1976.