摘要 以渔子溪电站4号机组为研究对象,运用了DH5922应力应变测试系统,对上机架进行了应力应变测试。结果表明,在各典型工况下,上机架靠近中心体的两条对称的支腿腹板拐角处出现应力集中,并且最大值为64.592Mpa,同时上机架各测试点应力变化具有小负荷区变化梯度较大,大负荷区变化较平缓的特点。 Taking the No.4 unit of Yuzixi hydropower station as the research object, stress strain of the upper bracket was tested by using the DH5922 stress strain test system. The results show that, in the all typical working conditions, stress concentrated comes where the corner which the two symmetric shaft leg hypoplax of upper bracket near the centrosome, and the maximum value was 64.836 Mpa, stress changes of each test point on the upper bracket with the low load zone have greater gradient, while the changes with high load area are placid.
出处 《大电机技术》 2015年第4期12-15,共4页 Large Electric Machine and Hydraulic Turbine
基金 国家自然科学基金项目(51379179) 西华大学学术成果培育项目(SBZDPY116)资助
关键词 渔子溪 上机架 应力应变 DH5922 Yuzixi upper bracket stress-strain DH5922
  • 相关文献

参考文献8

二级参考文献6

共引文献41

同被引文献4

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部