摘要
华能伊敏煤电有限责任公司发电厂作为国家"十·五"科技攻关计划引导项目"数字化电厂"项目的研究对象,在项目总体设计中提出了"数字化电厂"由控制、信息、仿真三部分组成,三者通过Simcoin"科英"平台实现了无缝连接。
As the research object of 'digitalized power plant',which is one of the guide projects of the National Key Technologies Research and Development Programs of China in the Tenth.Five-year Plan,in the general design the power plant of Huaneng Yimin Coal and Power Co.,Ltd.put forward that the 'digitalized power plant' comprises control part,information part and simulation part,the seamless connection of these three parts were realized through the Simcoin platform.
出处
《电力技术》
2010年第4期32-41,共10页
Electric Power Standarization & Construction Cost Control Information
关键词
数字化电厂
本质安全
检修决策
POA
安全包
经济包
决策包
digitalized power plant
intrinsic safety
overhaul decision
portable object adapter(POA)
safety package
economy package
decision package