摘要
本文从理论上论证了实验室吸收装置积分模拟工业吸收设备的可能性.在实验室中,在7组不同实验条件下,用球柱塔积分模拟填料塔,最大误差为5.9%.
It was theoretically shown that simulation of industrial absorption tower with laboratory equipment is possible. Simulation of packed tower with Sphe-ro-Cylindric Column was made in laboratory under seven different sets of conditions. The experimental results indicate that maximum error is about 5.9%.
出处
《化工学报》
EI
CAS
CSCD
北大核心
1989年第6期720-725,共6页
CIESC Journal