期刊文献+

兰渝线渭源站中心锚结窜动原因分析与对策 被引量:1

Analysis of Causes to Play of Mid Point Anchor at Weiyuan Station on Lanzhou-Chongqing Railway and Their Counter Measures
下载PDF
导出
摘要 兰渝线渭源车站接触网设备投运后初次过冬时站场八道接触网出现整体偏移,中心锚结同步窜动,失去防窜功能,通过现场调查与计算,分析了中锚窜动的原因,提出了整治对策,并结合现场实际进行了验证。 The occurrence of integral displacement of OCS and simultaneous play of mid point anchor at 8th track in station yard leads to the lose of anti-play functions after the OCS equipment at Weiyuan station on Lanzhou-Chongqing railway which is being put into operation and passes the winter for the first time,through site investigation and calculation,the causes to play of mid point anchor are analyzed,the treating measures are put forward and the verification is made accordingly in accordance with actual conditions at site.
作者 李生成
出处 《电气化铁道》 2019年第1期64-68,76,共6页 Electric Railway
关键词 中心锚结 窜动 原因分析 对策 Mid point anchor play analysis of causes counter measure
  • 相关文献

参考文献1

二级参考文献2

  • 1于万聚.接触网设计及检测原理[M].北京:中国铁道出版社,1993..
  • 2[2]李伟.接触网[M].北京:中国铁道出版社,2003.

同被引文献11

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部