摘要
从行车组织的角度对城市轨道交通全自动运行(FAO)模式引发的运营方面变化进行分析,围绕"硬件上设备可靠性提高、管理上乘务员需求弱化"两点核心,对地铁工程设计提出几点思路,包括场段出入线折返接轨终点站以减少地块切割、强化以热备车需求布局正线停车线、夜间正线停车以节省场段用地并提高列车运用效率、超长区间双向行车以提高隧道阻塞后的列车撤出效率;同时对FAO模式下的列车运行指挥体系进行初步构建。
Based on an understanding of train organization, this study analyses the changes in operation arising from the adoption of the fully automatic operating system(FAO). There are two key changes: more reliable equipment but less stewards are necessary. This study suggests some different design ideas, such as turning back the design of integration lines at depots to reduce the amount of land used, distributing the parking lines catering to requirements for spare trains, parking trains on main line in a dispersed manner at night to save land and increase the efficiency of trains, and having a bidirectional driving design in tunnels of long lengths to reduce the time needed to withdraw trains after a tunnel is blocked. Furthermore,the study suggests providing a preliminary scheduling outlining dispatches and commands for trains.
作者
鞠昕
张艳兵
JU Xin;ZHANG Yanbing(Beijing Urban Construction Design&Development Group Co.,Ltd.,Beijing 100037;Beijing MTR Construction Administration Corporation,Beijing 100068;Beijing Key Laboratory of Unattended Operation and Safety Monitoring and Control in Urban Rail Transit,Beijing 100068)
出处
《都市快轨交通》
北大核心
2019年第1期56-60,77,共6页
Urban Rapid Rail Transit
基金
北京市科委社会发展领域储备项目资助(D171100008117004)
关键词
城市轨道交通
全自动运行
行车组织
线路设计
列车运行指挥
urban rail transit
fully automatic operation
operation organization
metro line design
train operation command