期刊文献+

A Job Scheduling Model and Heuristic Algorithm for Minimizing the Range of Lateness and Makespan on Parallel Machines

A Job Scheduling Model and Heuristic Algorithm for Minimizing the Range of Lateness and Makespan on Parallel Machines
原文传递
导出
摘要 In this paper ,based on JIT management technique, a multi objective job scheduling model is presented. After a new algorithm is presented for minimizing the range of lateness on a single machine , a heuristic algorithm (named M-R algorithm)is given to be applied to the parallel machines’ systems . Finally , an illustrative example is given. In this paper ,based on JIT management technique, a multi objective job scheduling model is presented. After a new algorithm is presented for minimizing the range of lateness on a single machine , a heuristic algorithm (named M-R algorithm)is given to be applied to the parallel machines’ systems . Finally , an illustrative example is given.
出处 《Systems Science and Systems Engineering》 CSCD 1998年第1期51-56,共6页 系统科学与系统工程学报(英文版)
关键词 job scheduling production management FMS parallel machines job scheduling production management FMS parallel machines
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部