3[2]David A K, Wen Fushuan. Transmission planning and investment under competitive electricity market environment[A]. Proceedings of IEEE Power Engineering Society Summer Meeting, Vancouver (Canada)[C], 2001, Vol.3, 1725-1730.
4[3]Merrill H M, Wood A J. Risk and uncertainty in power system planning[J]. Electric Power & Energy Systems, 1991, 13(2): 81-90.
5[4]Yehia M, Chedid R, Ilic M, et al. A global planning methodology for uncertain environments: application to the Lebanese power system [J]. IEEE Trans on Power Systems, 1995, 10(1): 332-338.
6[5]Saraiva J T, Miranda V, Pinto L M V G. Impact on some planning decisions from a fuzzy modeling[J]. IEEE Trans on Power Systems,1994, 9(2): 819-825.
7[6]Madan S, Bollinger K E. Applications of artificial intelligence in power systems[J]. Electric Power Systems Research, 1997, 41(2):117-131.
8[7]Crousillat E O, Dofifner P, Alvarado P, et al. Conflicting objectives and risk in power system planning[J]. IEEE Trans on Power Systems,1993, 8(3): 887-893.
9[9]Rudnick H. Generation and transmission in developing countries:planning in a deregulated environment in developing countries:Bolivia, Chile and Peru[J]. IEEE Power Engineering Review, 1996,16(7): 18-22.