2Guoli,Gong Daxin,Freddie Tsui. Analysis and implementation of the BOM of a tree - type structure in MRPII[J].Journal of Materials Processing Technology, 2003 ( 139 ):535 -538.
3C. Ou - Yang and H. N. Pei. Developing a STEP - Based Integration Environment to Evaluate the Impact of an Engineering Change on MRP[J]. The International Journal of Advanced Manufacturing Technology, 1999 ( 15 ): 769 -779.
4Peter W. Stonebraker. Restructuring the bill of material for productivity:A strategic evaluation of product configuration,International Journal of Production Economics, 1996(45) :252 - 260.
5MohuaXiong, Shu Beng Tora, Li Pheng Khoob, Chun -Hsien Chen. A web - enhanced dynamic BOM - based available - to - promise system [J]. International Journal of Production Economics ,2003 ( 84 ): 133 - 147.