摘要
介绍了大型尾矿库勘察工程施工中钻探、取样、水文、物探及其他测试工作的困难和克服困难的方法及经验。
The No.2 tailing dam in the Dexing copper mine, Jiangxi is examplifed to introduce the reconnaissance and stable construction of large tailing dams, including drilling, sampling, hydrologic survey, geophysical survey and testing. The reasonable solution to problems and practical experinces are summarized
出处
《矿产勘查》
1997年第4期63-65,共3页
Mineral Exploration
关键词
尾矿坝
基础坝
堆积坝
沉积滩
tailing dam
foundation dam
pilling dam
depositing beach