摘要
停堆后冷却问题是中国先进研究堆(CARR)重要的安全问题之一。冷却措施的实施对CARR的安全和建设投资有较重要的影响。CARR采用停堆初期的强迫循环及停堆后期全堆芯自然循环相结合的策略实现正常停堆和事故停堆后的堆芯冷却。停堆冷却的过程具体分为主泵大质量惯性飞轮惰转强迫冷却、应急堆芯冷却系统强迫冷却、自然循环功能部件动作实现全堆芯自然循环3个阶段。3个阶段既相互衔接又相互独立,每个阶段各有特点。停堆冷却策略的实施证明,CARR停堆冷却过程是可靠、有效、合理的,符合先进研究堆的发展趋势。
How to cool down the reactor core after it is shutdown is one of the most important safety problems for China Advanced Research Reactor (CARR). The cooling measure will have a great effect on it's investment of construction. The forced circulation and the natural circulation are two ways used at shutdown mode. The forced circulation includes two parts, one is the running inertia cooling of the main coolant pump, the other is emergent cooling core system. At the last state of forced cooling, the natural circulation valve will automatically open and coolant will be reversed, then the forced circulation turn into natural circulation. This strategy will widen the method and accumulate the experiences for domestic research reactor and also testify that CARR is safe, economical and advanced.
出处
《原子能科学技术》
EI
CAS
CSCD
北大核心
2009年第S2期412-416,共5页
Atomic Energy Science and Technology
关键词
中国先进研究堆
停堆冷却
自然循环
强迫循环
China Advanced Research Reactor
cooling at reactor shutdown mode
natural circulation
forced circulation