摘要
对三福高速公路龙慈隧道强风化弱质围岩浅埋地段新奥法施工初期喷锚支护的施工过程进行了较为详细的叙述
A detailed description of the process of shot-concrete and support construction in Longci Tunnel of San(ming)-Fu(zhou) expressway is given. The characters of Longci are serious wreathe, Weak Country Rock Shallow-bury location and Neo-Austria method construction.
出处
《福建建设科技》
2002年第3期11-11,34,共2页
Fujian Construction Science & Technology