期刊文献+

CNPC Dina 2 Gas Field to Start up

CNPC Dina 2 Gas Field to Start up
全文增补中
导出
摘要 CNPC reported recently construction on Dina 2 GasField,located in Kuche county in the Tarim Basin,XinjiangUygur Autonomous Region is running smoothly now.Itis predicted to start up on June 30th,2009.CNPC formally commenced construction of Dina 2 gasfield on March 26th,2008.(CCR2008 No.10)Upon itscompletion,the field will offer 5 billion cubic meters
出处 《China Chemical Reporter》 2009年第11期14-14,共6页 中国化工报导(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部