摘要
Shanxi Jincheng Anthracite Coal MiningCompany (SJACMC) put its 120 MWcoalbed methane(CBM) power generationinto operation this July. A CBM liquefactionplant phase I came on stream at Jiafengtown, Qinshui county in Jincheng city ofShanxi province on July 5th, by The RongKong and China Gas Company (Towngas)and SJACMC. Qinshui CBM pipelinestarted operation on September 15th,(CCR2008 No, 28, No.21)