4[3]Buzacott J.A,Mandelbaum M.Flexibility and Productive in Manu-facturing Systems[J].Proceedings Annual ILE Conference.LosAngeles,CA.1985.
5[4]Gupta D.and Buzacott.A Framework for Understanding Flexibility of Manufacturing Systems[J].Journal of Manufacturing Systems,1989.
6[7]郁兴富.系统动力学原理及其应用[M].成都:西南财经大学出版社,1989.
7[9]Zhao Hua,Li Xuan,Shu Jidong.A Research on Mechanism of the Flexibility of Social Auditing System[A].Proceedings of 2005 International Conference on Innovation & Management.2005.8.
8[11]ERM-integrated framework executive summary:Committee of Sponsoring Organizations of the Treadway Commission (COSO),2004,9.
9[12]Larry E.Rittenberg and Patricia K.Miller.The IIA Research Foundaio.Sarbanes-Oxley Section 404 Work.Looking at the Benefits,2005.
10[13]Robert A.Jones and Joseph M.Ostroy.University of California.Discussion Paper[J],Flexibility and Uncertainty,1979,10.